BMW status codes · measured

Every BMW production status, explained

BMW’s order tracking speaks in numeric codes — 150 when production begins, 193 at the port, 199 when the keys change hands. Here is what each one means, in order, with the time cars actually spend at each stage, measured on the fleet this site tracks daily.

The pipeline

11 of 22 stages have measured times · click any stage
  1. 111Order received
  2. 112Scheduled for production
  3. 150Production begins
  4. 151Body assembly
  5. 152In the paint booth
  6. 153Entering assembly~1d
  7. 154Assembly in progress~1d
  8. 155Quality check~2d
  9. 160Final assembly
  10. 165Ready for transport
  11. 181Ready for transport~1d
  12. 182Awaiting carrier~4d
  13. 190Dispatched from factory~3d
  14. 193At the port~8d
  15. 195In transit~13d
  16. 1953At the destination port~11d
  17. 1955In transit to the dealer~2d
  18. 196At the dealer
  19. 197Being prepared
  20. 198Arrived at dealer~3d
  21. 199Vehicle delivered
  22. 200Delivered (final)

Watching one of these codes yourself? Bimmer Tracker follows your own order stage by stage and pushes you a plain-English note every time BMW moves it. See the app →

Where these numbers come from. Stage times are measured on the iX3 fleet this site tracks daily — real observed transitions, measured since 2026-08-17, not estimates. The status codes themselves are BMW-wide: every US order walks the same pipeline, so the meanings hold for any model; exact durations vary by plant and route. BMW publishes only the current status — codes occasionally step backwards when a car is re-sequenced, and that usually sorts itself out in a day or two. Not affiliated with BMW.